Joint Base Lewis McChord project. Entailed clearing of a retention pond of invasive weeds and trees to reduce habitat nesting in the areas. Installed 245,000 4″ HDPE Birdballs to deter wildlife from landing on the pond. Designed and installed foundations and stair riser assemblies to provide safe access for stormwater sampling at three separate locations on the JBLM.